Project Quick Summary
| Parameter | Details |
| Client Name | Iconic Ventures |
| Location | Corporate Park North, Randjespark |
| Project Type | Turnkey Fire Suppression System |
| Facility Size | 1500 m² Warehouse |
| Completion Year | 2026 |
| Scope | Design, Approvals, Supply, Installation & Commissioning |
Project Overview
For Iconic Ventures, we engineered and delivered a complete turnkey fire suppression system for a 1500 m² industrial warehouse facility at Corporate Park North, Randjespark.
The project included full fire engineering design, council submission, pump station installation, sprinkler reticulation network, bulk storage tank integration, detection system installation, and final commissioning. The system was designed in compliance with SANS 10400-T and local fire authority regulations.
This installation ensures high-level fire protection coverage across the entire warehouse, safeguarding infrastructure, inventory, and operational continuity through an automated and integrated suppression solution.
Scope of Work
Engineering & Approvals
- Fire engineering design & fire plans development
- Submission to council & regulatory approvals
- Detailed site assessment (pressure & flow rate analysis)
- Safety file & compliance documentation
Pump Station & Infrastructure
- Civil works as per SANS 10400-T
- 25,000-Litre Bulk Storage Tank
- Pumps & Piping within dedicated pump station
- Commissioning & system validation
Sprinkler & Piping Network
- 506 Pendent Sprinklers
- 95 Sidewall Sprinklers
- 2½” Main Piping Network
- ½” Sprinkler Branch Lines
- Valves, fittings & full reticulation integration
Detection & Control System
- 112 Smoke Detectors
- Central Control Panel & Alarm System
- Integrated detection & suppression logic
- Final testing & commissioning
Engineering Highlights
- Designed for full 1500 m² warehouse coverage
- 25,000L dedicated fire water storage capacity
- High-density sprinkler grid layout
- Integrated pump station with engineered pressure balancing
- Automated detection-to-suppression activation logic
- Complete council-compliant documentation & certification
Project Outcome
- Fully compliant SANS fire protection system
- Enhanced warehouse asset protection
- Automated fire detection and suppression response
- Improved insurance and regulatory compliance
- Long-term operational safety assurance
This project demonstrates our ability to execute complete life-safety engineering solutions, combining fire design expertise, regulatory compliance, and turnkey industrial installation capability under one contract.